top of page
thumbnail_IMG_0341.jpg
thumbnail_IMG_0341_edited.jpg

Make a difference

This stage focuses on improving drainage and stormwater infrastructure around the Cathedral, including:
CCTV inspection and high-pressure jet cleaning of ~37 downpipes
New stormwater pits and connecting pipes (perimeter works)
Upgraded sub-soil (aggregate) drainage connections
New stormwater pump
Drainage solution beneath the sacristy stairs (pooling water)
Trenching, backfilling, concrete reinstatement, and site clean-up

Amount

$10

Other

0/100

Comment (optional)

bottom of page